We carry out our projects in harmony with environment

en porad

Environmental impact assessment (EIA)

Our company does specialize on elaboration of EIA documentation. We took part on number of projects including assessment of significant large scale projects. We focus on detailed analyze of the area and investment activity, trying to identify the risk in the early stage of the project. Our documentation is a quality work, which will help you to overcome times and financial losses in later stage of the project.
We offer in this area:

  • Preliminary Study
  • Environmental Report elaboration
  • Notification about change of proposed activity
  • Public hearing participation
  • Consultations with state bodies and offices
  • Expert Review elaboration


Preliminary environmental study
According act no. 24/2006 on EIA it is the first step of EIA procedure. Upon analyzing of the client needs and legislation possibilities we elaborate Preliminary Environmental Study (PES). During the EIA process we provide client support in form of expert consultations and for decision making state institutions we elaborate all necessary documents and data needed for their decision.

Environmental impact report
It is the second step of environmental assessment. On the base of scoping and time schedule outlined by Ministry of the Environment we elaborate Environmental Impact Report. Our services are complex and contain taking part in the public hearing including presentation of environmental study outputs to public. We provide client support until the final record from the EIA process is issued.

Expert review
According to act no. 24/2006 on EIA we prepare expert review to assess EIA documentation and process of EIA.

References - Environmental impact assessment (EIA)

Buildings for living and polyfunctional buildings
  • Polyfunctional residential complex Dúbravčice east I. stage , Bratislava – Dúbravka and Polyfunctional residential complex Dúbravčice east II. stage Bratislava – Dúbravka notice of change, 2016.
  • ASKO + EBOX Banská Bystrica, preliminary study, 2016
  • Assessment of conditions for construction permit, Appartment Block BD2, 2015
  • Assessment of conditions for land use permit, Appartment Block BD2, 2015
  • Shop and pantechnicon SCONTO, Žilina, preliminary study, 2015
  • Dream Hill - polyfunctional object, Staré Grunty, Bratislava, preliminary study, 2015
  • Leisure area JAMA, preliminary study 2015
  • Polyfunctional object Lidl, notice of change 2014
  • WIKI Distribution and commercial centre, preliminary study, 2014
  • Appartment block BD2, Devínska Nová Ves, preliminary study, 2014
  • Polyfunctional object Ružinovská 1, preliminary study, 2013
  • Finishing of building and additional building of the Office building LIDL in Ružinovska street in Bratislava – additional area of parking lot, notice of change, 2013
  • APARTMENT BUILDING BD2, Preliminary Study, 2013
  • Enlargement of Pezinok cemetery – 1. part, Notification of change, 2012
  • Completion and extension of administrative building LIDL on Ružinovská street in Bratislava, Notification of change, 2012
  • Shopping centre - Stupava, Mást locality, preliminary study 2012
  • Shopping centre on Slovnaftská street – Podunajské Biskupice, Bratislava, preliminary study 2011
  • Residential complex Vtáčnik, preliminary study, 2010
  • Shopping store LIDL and administrative building on Ružinovská street in Bratislava , preliminary study, 2009
  • Polyfunctional object Ivánska cesta, Bratislava , preliminary study, 2007
  • Petržalka – south district, south developing area (South city), environmental report, 2006 (3)
  • Administrative center STRABAG – HEADQUATERS SK - BRATISLAVA , preliminary study, 2006 (3)
  • Supermarket LIDL Galvaniho street , Bratislava , preliminary study, 2005 (3)
  • Polyfunctional object Botanik, preliminary study, 2005 (3)
  • Polyfunctional object Fazuľová - Radlinského ul., preliminary study, 2005 (3)
  • Shopping store LIDL Galvániho street – 128 parking lots, preliminary study, 2005 (3)
  • Trnava – Modranka, construction of family houses, preliminary study, 2005 (3)
  • Living satellite Kočišské – Trnava, preliminary study, 2004 (3)
  • Polyfunctional object Bajkal Park Project (Eden Park), preliminary study, 2004(3)

In cooperation with 3) EKOJET

Industrial buildings
  • Deposit of liquid fertiliser DAM, Sládkovičovo, preliminary study, 2016
  • Logistic and manufacturing hall, preliminary study, 2014
  • Administration and manufacturing building Prievidza, preliminary study 2014
  • Industrial battery warehouse Petržalka, preliminary study, 2014
  • SKC Projekt Slovakia, new foundry, Petrovany, preliminary study 2014
  • Production of semi-finished products for automotive industry, preliminary study 2014
  • Winter shelter for cattle breeding BTPM, Mojšova Lúčka, preliminary study 2014
  • Gasifier power plant Pezinok, preliminary study 2014
  • SKC Project Slovakia, new foundry, preliminary study 2014
  • Store of liquid fertilizer DAM, Senica, Preliminary Study, 2013
  • Logistic centre Airport M.R.Štefánika Bratislava, Preliminary Study, 2012
  • New building of mixing plant ZLATNER s.r.o., Levice, preliminary study, 2011
  • Logistic park Towercom, preliminary study, 2010
  • Logistic park Petrovany, preliminary study, 2010
  • Logistic and production park Lozorno, preliminary study, 2010
  • Logistic center Lozorno, preliminary study, 2009 (present state of the environment)
  • Industrial and production area Levice, preliminary study, 2008
  • Logistic and assembly park Lozorno, preliminary study, 2008
  • Environmental assessment of planned expansion of Ospra-Invest company, Rovinka, 2008(2)
  • Mining of sand on locality Borský Peter, preliminary study, 2007
  • Industrial areal TRW, Bytča, preliminary study 2006 (3)
  • Logistic center Gáň (1. phase), preliminary study 2006 (3)
  • Industrial park DNV – III. phase, preliminary study, 2006 (3)
  • Production hall for the sweets, Levice, preliminary study, 2005 (3)
  • Warehouse on Trstínska street, Trnava, preliminary study, 2004 (3)

In cooperation with 2) EKO-ADR 3) EKOJET

Waste Industry
  • Yard waste collection Bratislava - Petržalka, extension, preliminary study, 2016
  • Interim storage of hazardous waste and metallic waste products in Bratislava – Vrakuňa premises, preliminary study, 2016
  • Electronic waste and metallic waste collection yard, industrial area Nitra IDEA, preliminary study 2015
  • Metallic waste collection yard in Jablonica, preliminary study 2015
  • Car recycling facility in Čáry, preliminary study 2014
  • Gasifier power plant Pezinok, Environmental report, 2014
  • Waste collection yard Prievidza, preliminary study 2013
  • Device for old cars recycling in Prietrž, Notification of change, 2013
  • Waste collection yard on pontoon P-65, Port Bratislava, Preliminary Study 2013
  • Risk study for selection of locality for collection and processing of electronic waste Banská Bystrica, 2012
  • Center for collection and processing of electronic waste Košice, Prelimitary Study, 2012
  • Center for processing of electronic waste Trnava, Prelimitary Study, 2012
  • Collection of metal waste in Gbely centre, Prelimitary Study, 2012
  • Collection of metal waste, old vehicles, electronic waste and battery in Kopčany centre, Prelimitary Study, 2012
  • Collection yard for metals, electronic waste and batteries in Čáry centre, preliminary study, 2012
  • Center for electronic waste processing Petržalka, preliminary study, 2012Transit shed of electronic waste Trnava, Preliminary Study 2011
  • In-process store of dangerous and common waste Senec, preliminary study, 2011
  • Waste collection centre Holíč, preliminary study, 2011
  • Collection of metals in Prietrž centre, preliminary study, 2011
  • In-process store of electronic waste Petržalka, preliminary study 2011
  • Facilities for processing of plastic materials Pezinok premises – change in  technology, announcement about change, 2011
  • Waste collection yard Bratislava – Devínska Nová Ves, environmental report, 2010
  • Recycle and waste collection yard Vassal EKO Podunajské Bickupice, environmental report 2010
  • Recycle and waste collection yard Vassal EKO Podunajské Bickupice, preliminary study, 2010
  • Waste collection yard Bratislava – Devínska Nová Ves, preliminary study, 2010
  • Device for plastic waste Pezinok, preliminary study, 2009
  • Device for old cars in Horný Majer, Lok, preliminary study, 2009
  • Center for recycling of electronic waste, Rohožník, preliminary study, 2007 (2)
  • Extension of center for waste recycling Lok, environmental report, 2007 (2)

In cooperation with  2) EKO-ADR

Energetic buildings
  • Wind park Poľana and Wind park Babínska hoľa, preliminary study, 2010
  • Wind park Mokrý Háj, expert review, 2010
  • Wind park Opava, preliminary study, 2008 (1)
  • Wind park Chropov, preliminary study, 2008 (1)
  • Wind park Pribeta, environmental report, 2008 (4)
  • Wind park Sereď, environmental report, 2008 (1)
  • Wind park Šaľa, environmental report, 2008 (1)
  • Wind power plant Petra , preliminary study, 2008 (1)
  • Wind par Komjatice, preliminary study, 2007 (4)
  • Wind park Pribeta, preliminary study 2007 (4)
  • Wind park Orechová Potôň, environmental report, 2007 (1)
  • Wind park Sereď, preliminary study, 2007 (1)
  • Wind park Šaľa, preliminary study, 2007 (1)

 In cooperation with 1) ENVIS 4) Mgr. Ronald Blaho

Recreational buildings
  • Assessment of conditions for construction permit, Leisure area JAMA, 2016
  • Assessment of conditions for land use permit Leisure area JAMA, 2015
  • Leisure area JAMA, preliminary study, 2015
  • Cottage area STUDIENKA, preliminary study, 2013
  • The change of apartman house Chopok into Wellness Hotel Chopok**** and depandance hotel in standard of apartman hotel***, expert review, 2009
  • Modernization and reconstruction of sky resort Čremošné, expert review, 2008
  • Pension Rovná Hora, expert review, 2007
  • Sport and recreational area Nandin dvor, preliminary study, 2006 (3)
  • Recreation area of water sports Bratislava – Jarovce, preliminary study, 2005 (3)

In cooperation with 3) EKOJET 

Traffic buildings
  • Logistical and distribution park Lozorno – SO 119 – DE – parking lot of trucks, notice of change, 2014
  • Technical sanitary maintenance centre Žilina, project preparation, Environmental report 2014 (6)
  • Technical sanitary maintenance centre Košice, project preparation, Environmental report 2014 (6)
  • ŽSR, completion of railway depot Žilina – Teplička and its infrastructure in Žilina node, Expert review, 2013
  • ŽSR, Terminal station of integrated public transport  Moldava nad Bodvou city, environmental report, 2011 (6)
  • Žst. Čierna nad Tisou, transloading complex – east, environmental report, 2011 (6)
  • IV. Quadrant Bratislava airport, urbanistic study, 2009
  • Modernization of railway Žilina – Košice, part Krompachy (excluded) – Kysak, expert review, 2008
  • Road I/61 Bratislava – Senec, environmental report, 2006 (3)
  • Speed road R2 Zvolen – Lovinobaňa, environmental report, 2004 (3)

In cooperation with 3) EKOJET  6) REMING CONSULT

Request

Kde nás nájdete

Address

Seat and postal address:
ADONIS CONSULT, s.r.o.
Eisnerova 58/A
Bratislava 841 07
Slovakia

Office:
ADONIS CONSULT
Sekurisova 12
Bratislava  841 02

Pluhová 2
Bratislava 831 03

tel.: +421 904 591 037
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it.

About Us

We carry out our projects in harmony with the environment and our goal is to help the implementation of projects that support local communities, increase employment and are not harmful to environment.